Handy Hints
PLAN AHEAD
Always plan ahead. Time spent on preparation makes the tile fixing easier, quicker and ensures a better result.
TILING ONTO PLASTER/CONRETE
For recently plastered surfaces allow approx 4 weeks drying out time. For concrete allow approx 1 week per inch of depth. (Depends on atmospheric conditions)
SETTING OUT
Spend time setting out your tiles before fixing, remembering to allow a grout joint of at least 3mm. Tile Spacers will ensure accurate spacing.
CUTTING
Avoid small cuts, these can be difficult to fix and do not look professional.
INSTRUCTIONS
Always follow manufacturers instructions provided with any products.
ADHESIVE
It is essential to have a solid bed of adhesive behind the tiles to avoid any cavities.
DRILLING HOLES INTO TILES
We sell drill bits for cutting holes in tiles for pipes etc. including porcelain
LAYOUT
If you are using a professional fixer, please take time to agree the layout/design of the tile installation, ie height of borders etc
UNDERFLOOR HEATING
If fitting underfloor heating please use a qualified electrician for the electrical connections.
SPARE TILES
Always keep spare tiles in case of accidents or changes to your room.
NATURAL STONE
Natural stone requires sealing and maintenance, we stock all the products you will need to give the desired result.
DISPOSAL OF MATERIALS
Don’t empty adhesive/grout residue into drains. Always dispose of waste/packaging sensibly.
GOT A QUESTION?
If in doubt about your purchase please telephone us and we will endeavour to help. Dedicated technical advice lines are listed below and in most instances will be able to answer your query.
TECHNICAL ADVICE LINES
DEVI 01359 242400
PCI 0191 428 2266
WEBER 01525 722137
LITHOFIN 01926 732126
SOVEREIGN 0845 603 0722
Remember, if in doubt, ask!!
SAFETY FIRST
Wear safety goggles when cutting/drilling tiles
Beware of any hidden pipes and cables
Keep work tools away from children
Take care when lifting, some tile boxes maybe heavy
Cut tile edges can be sharp
|